Product documentation — installation, licensing, and integration guides.
Domains
Hypersonics and fast flyers

Hypersonics and fast flyers: Domain Specification

Stiff 6-DOF / MDAO IVP · flight-processor parity · qual replay · Domain / program lane

Product titleHypersonics and fast flyers (domain)Document statusExternal draft 1.0
Prepared byResonix Labs (USA), Inc.Date issued20 October 2026
Domain overview
Program lane
Typical programs
Hypersonic and fast-maneuvering flyer programs integrate customer 6-DOF, propulsion, and coupled aero-thermal surrogate dynamics with stiff time scales (trajectory, attitude, heating/transient chemistry) before HIL and flight-test lock-in. Resonix does not sell CFD meshes, TPS material models, or a boost-glide vehicle digital twin · we license SciPy-shaped IVP integrators, pre-lock Scout/Tune routing, ground-only Jump DOE rank, Edge parity on the flight processor, and SolvNum when replay must match across lab and avionics hardware.
Boost-glide and maneuvering reentry 6-DOF simulation; Fast-flyer guidance and control HIL on recorded test streams; Large aerodynamic, control, and MDAO surrogate parameter studies; Digital-thread replay across lab, HIL, and avionics processors
Eval path
Scenario
Four KPI families (do not merge into one headline): (1) Scout/Tune · dead-zone disclosure and routing vs incumbent (BDF/Radau/CVODE-class) on representative hypersonic surrogate RHS via local wheel; report archived for SBOM/qual package. (2) SolvSRK IVP · 30-day side-by-side on customer boost-glide or engagement plant (survival, wall time, error vs incumbent) with recorded HIL noise coupling where applicable; lab receipt FULL ENGINEERING_PASS LAB hypersonic surrogate IVP bundle 120/120 mandated cells · SolvSRK vs scipy BDF at σ≥0.1 on hypersonic_boost_glide_6dof, hypersonic_aero_thermal_coupled, and hypersonic_aero_stagnation_8 (not customer HIL tape, wind-tunnel, or CFD). (3) SolvJump · one agreed aero/control/MDAO grid: shortlist wall-clock vs naive full-SRK sampling with golden SRK on finalists only; lab receipt FULL ENGINEERING_PASS LAB boost-glide 6-DOF parameter grid 40/40 golden SRK cells (rank alone not qual). (4) SolvSRK-Edge + SolvNum · pinned revision with six-problem parity gate and 3-6 month SolvNum pilot for bit-identical replay on bounded hot path across laptop, HIL, and tactical processors; lab receipts FULL ENGINEERING_PASS LAB Edge parity 120/120 cells and SolvNum fixture digests 60/60 cells · partner HIL tape and customer qual matrix remain OPEN scoped eval.
Typical embed map (hypersonics GN&C lane, not CFD/TPS prime) Customer vehicle model, aerodynamic tables, TPS/CFD toolchain, HIL rig, and flight software stay yours. SolvScout/SolvTune fingerprints coupled 6-DOF or MDAO surrogate RHS locally before integrator lock-in. SolvSRK (SciPy-shaped IVP API) runs golden proof in sim and on recorded HIL streams; SolvJump ranks large aero/control grids ground-only; finalists get golden SRK then SolvSRK-Edge freeze · the HIL binary is the deploy binary. SolvNum wraps a bounded replay hot path when qual requires bit-identical output across investigation laptops, HIL rack, and flight processors.
Resonix boundary
We license libraries your engineers embed in sim, HIL, and onboard guidance call paths. We do not operate your CFD center, TPS design authority, HIL facility, or flight-test program office.
SWaP / edge
Missile and munition engagement stacks with seeker-heavy terminal homing: see Missile GN&C domain sheet. Full digital-engineering / Section 818 artifact templates: see Digital engineering domain sheet. Resonix does not operate your wind tunnel, CFD center, or MDAO platform.
Where it fits

Customer MDAO plant→Scout / Tune→SolvSRK→HIL rack→SolvSRK-Edge

Parameter grid→SolvJump→Top 50-100→Golden SolvSRK→Edge carry-forward

Bounded hot path→SolvNum substrate→Investigation replay→HIL rack→Flight processor

Sim / HIL 6-DOF plant

  • Boost-glide and fast-flyer guidance simulation
  • Processor-in-loop qual on recorded test streams

Aero / control DOE

  • Large aerodynamic and control-parameter design studies

Flight-test qual replay

  • Digital-thread replay across lab and avionics targets
Capabilities

Deliverables Resonix licenses in this domain (library behavior and artifacts). See product technical sheets for full spec grids.

CodeCapabilityDeliverableProduct
C1Stiff engagement simulationNoisy IVP on customer fast-flyer and engagement plants.SolvSRK (Primary)
C2Flight-processor embedFrozen HIL build on the avionics processor.SolvSRK-Edge (Primary)
C3Digital-thread replayDeterministic replay across lab and avionics targets.SolvNum (Primary)
C4Large parameter DOEJump shortlist before golden SRK campaigns.SolvJump (Primary)
C5Integrator fingerprintScout/Tune routing before HIL lock-in.SolvScout / SolvTune (Primary)
C6GN&C uncertainty envelopesSolvSRK-UQ on terminal state for review packages.SolvSRK-UQ (Supporting)
Product spec snapshot (this domain)

Quantitative lines a practitioner in this lane would budget or eval; not a repeat of capabilities. Lab metrics are labeled; end-to-end proof is on customer tapes.

SolvScout / SolvTune

  • Why embed: SolvScout and SolvTune fingerprint your dynamics locally and rank honest integrator routing · including when SolvSRK is not the fit · before you freeze HIL or flight software (not an integrator themselves).
  • Why try now: Free local portal wheel; customer RHS never leaves your network. Use the 443-problem corpus readout, then scope a 30-day SolvSRK side-by-side only when Tune recommends it.
  • Integration contract: Pre-production local wheel (customer MDAO/6-DOF RHS never leaves your network); fingerprint boost-glide, propulsion-attitude, or coupled aero-thermal surrogate models before HIL or flight-software freeze; export Scout/Tune report + routing recommendation for SBOM / qual data package.
  • Customer inputs: Representative IVP models (RHS, tolerances, noise coupling from recorded HIL streams); incumbent integrator name (BDF/Radau/CVODE-class) for honest routing when SolvSRK is not the fit.
  • Eval KPIs: Dead-zone disclosure, recommended arm vs incumbent, and whether a 30-day SolvSRK side-by-side is warranted · not HIL or flight-test sign-off from fingerprint alone.
  • Routing corpus (lab): Registered space_reentry / hypersonic surrogate cells (e.g. boost-glide 6-DOF, aero-thermal coupled fixtures) · lab routing readout, not customer wind-tunnel or CFD acceptance.
  • Known limits: Empirical fingerprint; σ=1.0 noise admit on some hypersonic corpus cells requires manual review per Tune policy · disclose on report.

SolvSRK

  • Why embed: SolvSRK is a stiffness-aware hybrid IVP integrator that keeps noisy, coupled plant and between-frame propagation completing when standard BDF/RK arms stall · drop it into your existing dynamics call path (not a planner, SLAM, or vision product).
  • Why try now: 30-day side-by-side on your RHS, tolerances, and noise coupling; pass/fail on survival, wall time, and error vs incumbent. Run SolvScout/SolvTune first to surface dead zones before lock-in.
  • Integration contract: SciPy-shaped solve_ivp-class API in customer 6-DOF / engagement plants, between-frame propagation for guidance loops, and coupled propulsion-attitude-aero-thermal surrogate RHS; optional Jacobian; on-prem / air-gap · no Resonix-hosted runtime.
  • Customer inputs: Dynamics RHS, time span, tolerances, and noise coupling from models or recorded HIL streams; you own aerodynamic tables, TPS surrogate wiring, and M&S environment (Resonix does not ship a hypersonic vehicle model).
  • Eval KPIs (IVP layer): Survival, wall time, and error vs incumbent on customer RHS · 30-day side-by-side; not end-to-end trajectory Monte Carlo or CFD mesh KPI.
  • Lab receipt (G1 / LAB surrogate IVP bundle): FULL ENGINEERING_PASS on mandated 120/120 cells · SolvSRK vs scipy BDF at σ≥0.1 on hypersonic_boost_glide_6dof, hypersonic_aero_thermal_coupled, and hypersonic_aero_stagnation_8 (HYPEVAL-1); corpus tier LAB · lab surrogate ODE replay, not customer HIL tape or CFD sign-off.
  • Known limits: No product-wide WCET; not DO-178C certified; no signed customer field HIL on record · partner HIL tape eval OPEN.

SolvSRK-Edge

  • Why embed: SolvSRK-Edge ships the same SolvSRK solver revision from desktop sim through HIL to the onboard processor · one binary lineage in the SBOM with a documented six-problem x86↔ARM parity gate · so bench evidence maps to flight without a separate embedded rewrite (not a vision or fusion stack).
  • Why try now: Side-by-side on customer dynamics vs incumbent on your HIL target hardware; pin one product revision across sim, HIL, and deploy before qual claims.
  • Integration contract: Same SolvSRK product revision in desktop sim, HIL rig, and onboard guidance predict/propagate on the flight processor; parity manifest pinned in platform SBOM (ARM64 / embedded Linux / RTOS-hosted).
  • Parity gate (lab): Documented six-problem x86↔ARM study · the binary exercised in HIL is the binary you deploy (product technical spec G-010 policy).
  • Lab receipt (G2 / LAB parity manifest): FULL ENGINEERING_PASS on mandated 120/120 cells · six-problem x86↔ARM parity on reference matrix (G-010 policy · HYPEVAL-2); corpus tier LAB · fixture tier, not partner silicon qual or customer HIL sign-off.
  • Customer inputs: Target avionics image, HIL interface to dynamics call path, incumbent onboard integrator for side-by-side on your hardware.
  • Eval KPIs: Survival/wall time/error vs incumbent on HIL target; binary hash match sim↔HIL↔field for pinned revision · qualify WCET and RAM on your flight computer.
  • Known limits: Terminal homing / seeker coupling on contested flight-controller targets out of Edge SKU scope unless in scoped RHS eval; no universal WCET table.

SolvJump

  • Why embed: SolvJump explores huge parameter grids at ground speed and ranks a shortlist · typically top 50-100 configs in minutes · on studies that would take tens to hundreds of hours to brute-force with full SolvSRK; golden SRK runs only on finalists (SolvJump never ships onboard).
  • Why try now: One customer grid: compare Jump shortlist wall-clock vs naive full-SRK sampling; golden SolvSRK on agreed finalists; archive receipts with deploy SBOM.
  • Integration contract: Ground-only Configurator; ranks top 50-100 configs from your aerodynamic, control, or MDAO parameter grid (Cma tables, actuator limits, TPS stack bounds in surrogate ODEs); Jump never ships onboard · golden SolvSRK on finalists only, then SRK profile flows to SolvSRK-Edge.
  • Customer inputs: Parameter grid definition, bounds, and objective (wall time, survival, terminal error vs incumbent); HPC baseline for wall-clock comparison.
  • Eval KPIs: Shortlist wall-clock vs naive full-SRK grid sampling; finalist list receipt; golden SRK survival/error on agreed finalists · not qual sign-off from rank alone.
  • Lab receipt (G3 / LAB boost-glide grid): FULL ENGINEERING_PASS on mandated 40/40 golden SRK cells vs brute-force baseline on boost-glide 6-DOF parameter grid (HYPEVAL-3); corpus tier LAB · Jump rank alone is not qual sign-off.
  • Known limits: Jump ranks surrogate ODE grids; does not replace CFD mesh studies or full vehicle MDAO toolchain sign-off.

SolvNum

  • Why embed: SolvNum is a deterministic arithmetic substrate on the hot path you choose · same inputs produce bit-identical outputs across laptop, HIL, and tactical processors for qual and anomaly replay (not a replacement for your fusion or control logic).
  • Why try now: 3-6 month subsystem pilot on a bounded path you define; pass/fail bit-identical output across your qual hardware matrix.
  • Integration contract: Deterministic arithmetic substrate on a bounded hot path you define (guidance replay, control qual, anomaly reconstruction on recorded flight-test streams) · not a solver, not CFD; customer maps in-scope ops under ITAR/NDA.
  • Customer inputs: Subsystem source, qual test vectors, hardware fleet list (lab, HIL rack, tactical processors); pass/fail bit-identical criteria agreed with cert authority before pilot lock.
  • Eval KPIs: Bit-match across qual hardware matrix on agreed vectors · 3-6 month subsystem pilot; separate KPI family from IVP survival or DOE rank scores.
  • Qual artifact bundle: SolvNum replay receipts + pinned SolvSRK-Edge binary hash + Scout/Tune run logs when digital-thread parity is in scope.
  • Lab reference: Four-platform determinism demo (x86, ARM, GPU, WASM); defense pilots target customer subsystem bit-match · no signed field pilot on card.
  • Lab receipt (G4 / LAB fixtures): FULL ENGINEERING_PASS on mandated 60/60 bit-match cells · reference subsystem digests across x86/ARM/WASM fixture classes (HYPEVAL-4); corpus tier LAB · not customer qual hardware matrix.
  • Known limits: Defense packaging in progress; bounded-update determinism only.

SolvSRK-UQ

  • Why embed: SolvSRK-UQ attaches terminal uncertainty envelopes to SolvSRK trajectories · terminal state error bars for GN&C safety and review packages without Monte Carlo farms on every run (requires SolvSRK entitlement; pilot SOW only, not default deck SKU).
  • Why try now: Side-by-side vs Monte Carlo reference on customer boost-glide or engagement scenarios before safety-case citation · exhibits mapped to requirement IDs under contracted pilot.
  • Known limits: Coupled MDAO+UQ boost-glide+TPS campaigns remain partner-scoped; standard handouts omit UQ until pilot SOW attached.