Product documentation — installation, licensing, and integration guides.
Assured Prediction
Engineer Eval

Assured Prediction · engineer eval

Engineer pilot handout · recommend a 30-day side-by-side

Short read for integration leads: what to compare, pilot KPIs, and what we will not claim. Download PDF · Full technical specification

  • JobGate existing SAR (or similar) classifier outputs: auto-clear confident chips; send uncertain chips to analysts.
  • Compare toReview every chip manually, or run fully automated classification with no abstention.
  • Pilot KPIsAccepted-set accuracy at your chosen auto-clear rate (coverage); analyst hours per sortie; error rate on auto-cleared vs all-manual baseline.
  • 30-day pilotReplay your softmax logits or probabilities on a recorded chip archive; ops sets coverage; report stats across multiple random seeds.
  • Pass (example gate)At 50% auto-clear: 5th-percentile accepted-set accuracy ≥ 92% and analyst load ≥ 40% lower than review-all.
  • Lab evidence (scope)MSTAR 4-class SAR chips (17° train / 15° test): at 50% coverage, accepted-set accuracy ~95-99% depending on backbone; ~45% analyst load reduction vs review-all on tested CNN path. Not full-coverage ATR.
  • Do not compare toSOC10 / MANets ~99% metrics that classify every chip (different product: we abstain on half).
  • IntegrationFloat64 `[samples × classes]` probs or logits in; per-sample accept/reject + class out. No retraining required.